Abstract

back
   Back


Paper
Improving Capital Project and Asset Management Success with Esri Technology
Track: Water, Wastewater, and Stormwater
Author(s): Gary McFarland, John Guilfoyle, Jerry Colwell

Goleta Water District is implementing an end-to-end asset management solution to support its multi-million dollar water treatment system upgrade. The solution manages data during the capital improvement design and construction phases and supports long-term operations and maintenance requirements. The solution consists of ArcInfo and ArcIMS integrated with Goleta's Work and Maintenance Management and Integrated Content Management systems. A key feature of Goleta's solution is the ability to capture and view documents, pictures, PDFs, and other unstructured content from within the GIS. Goleta can now leverage information such as operating procedures, inspection reports, and record drawings produced during the construction phase to support operations and maintenance activities once the assets are installed. System development included conversion of Goleta's existing AutoCAD and MapGuide applications to an enterprise ArcInfo GIS and ArcIMS Web solution.This paper will discuss Goleta's project objectives, implementation process, and benefits achieved.

Gary McFarland
Goleta Water District
Engineering
4699 Hollister Ave
Goleta , CA 93110-1999
US
Phone: 805-879-4624
Fax: 805-879-4655
E-mail: glmcfarland@GoletaWater.com

John Guilfoyle
TAG The | Asset | Group
Integrated Solutions
380 Interlocken Crescent, Suite 700
Broomfield , CO 80021
US
Phone: 303-439-2743
Fax: 303-439-2701
E-mail: john.p.guilfoyle@mwhglobal.com

Jerry Colwell
Montgomery Watson Harza
TAG The | Asset | Group
380 Interlocken Crescent
Suite 700
Broomfield , CO 80021
US
Phone: 303 439-2751
Fax: 303 439-2701
E-mail: Jerry.J.Colwell@mwhglobal.com

Contact Us | Privacy | Legal | Careers